Operators instructions cleverlevel switch, lffs, Mounting – Baumer CleverLevel - LFFS User Manual
Page 3
Installation of 3A approved and EHEDG certified products:
1) Use only a 3A approved counter part.
2) The inspection hole should be visible and drained.
3) Mount the instrument in a self drained position.
4) Level the inner surface of the pipe with the counter part.
5) Welding's should be grinded to Ra= 0.8
Operators instructions
CleverLevel switch, LFFS
Example
with 8126-928
Example
with PM023
Example
with 8126-916
Leakage indication hole
must be places downwards
Fitted
incorrect
Cannot be
drained
WARNING
After installation and configuration
Check the leak tightness of the sleeve.
Check the tightness of glands or M12 plugs.
Check the tightness of the cover
Mounting
Tighten the union with a torque of:
Std. version 20...25 Nm.
Sliding connection 25...30 Nm.
www.baumer.com
Operators instructions: 11109132 02 EN Page 3 / 12