Prepare instrument, Prepare instrument 9, Calibrate system – Bio-Rad Rat Diabetes Assays User Manual
Page 11
9
2. Prepare Instrument
Start up and calibrate the Bio-Plex
®
100/200 or similar system with
Bio-Plex Manager
™
software prior to setting up the assay. The calibration
kit should be run daily or before each use of the instrument to standardize
the fluorescent signal. To prepare either a Bio-Plex 3D or Bio-Plex
®
MAGPIX
™
reader, consult its respective user manual.
The validation kit should be run monthly to ensure performance of fluidics
and optics systems. Refer to either the software manual or online Help for
directions on how to conduct validation.
Start Up System (Bio-Plex 100, 200, or Similar)
1. Empty the waste bottle and fill the sheath fluid bottle before starting
if high throughput fluidics (HTF) are not present. This will prevent
fluidic system backup and potential data loss.
2. Turn on the reader, XY platform, and HTF (if included). Allow the
system to warm up for 30 min (if not already done).
3. Select Start up
and follow the instructions. If the system is idle
for 4 hr without acquiring data, the lasers will automatically turn off.
To reset the 4-hr countdown, select Warm up
and wait for the
lasers/optics to reach operational temperature.
Calibrate System
1. Select Calibrate
and confirm that the default values for CAL1
and CAL2 are the same as the values printed on the bottle of
Bio-Plex calibration beads. Use the Bio-Plex system low RP1
target value even if assays will be run at high RP1.
2. Select OK and follow the software prompts for step-by-step
instructions for CAL1 and CAL2 calibration.
Note:
In Bio-Plex Manager version 6.1 and higher, startup, warm up,
and calibration can be performed together by selecting the “Start up and
calibrate”
icon.