beautypg.com

Prepare instrument, Prepare instrument 9, Calibrate system – Bio-Rad Rat Diabetes Assays User Manual

Page 11

background image

9

2. Prepare Instrument

Start up and calibrate the Bio-Plex

®

100/200 or similar system with

Bio-Plex Manager

software prior to setting up the assay. The calibration

kit should be run daily or before each use of the instrument to standardize
the fluorescent signal. To prepare either a Bio-Plex 3D or Bio-Plex

®

MAGPIX

reader, consult its respective user manual.

The validation kit should be run monthly to ensure performance of fluidics
and optics systems. Refer to either the software manual or online Help for
directions on how to conduct validation.

Start Up System (Bio-Plex 100, 200, or Similar)

1. Empty the waste bottle and fill the sheath fluid bottle before starting

if high throughput fluidics (HTF) are not present. This will prevent
fluidic system backup and potential data loss.


2. Turn on the reader, XY platform, and HTF (if included). Allow the
system to warm up for 30 min (if not already done).

3. Select Start up

and follow the instructions. If the system is idle

for 4 hr without acquiring data, the lasers will automatically turn off.
To reset the 4-hr countdown, select Warm up

and wait for the

lasers/optics to reach operational temperature.

Calibrate System

1. Select Calibrate

and confirm that the default values for CAL1

and CAL2 are the same as the values printed on the bottle of
Bio-Plex calibration beads. Use the Bio-Plex system low RP1
target value even if assays will be run at high RP1.


2. Select OK and follow the software prompts for step-by-step
instructions for CAL1 and CAL2 calibration.

Note:

In Bio-Plex Manager version 6.1 and higher, startup, warm up,

and calibration can be performed together by selecting the “Start up and
calibrate”

icon.

This manual is related to the following products: