beautypg.com

Field operation, Skip and double checks – Great Plains YP2425A Operator Manual User Manual

Page 52

background image

48

YP2425A

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-626M

Table of Contents

Index

2014-02-10

Field Operation

Perform all steps in “Pre-Start Checklist” on page 23
and “Field Set-Up Checklist” on page 46.

Note: Use Depth Control mode. If tractor 3-point hitch

control is set for Load Control, hitch movement
may cause changes in row unit depth resulting in
uneven depth control.

First Pass Operation Checklist

Page

1.

Raise planter and line up at start of first
planting row

26

2.

Set tractor 3-point hitch to “depth
control” operation (and not load control)

-

3.

Unfold marker on next-row side.

38

4.

Set fan hydraulic circuit to low flow,
engage circuit. Gradually adjust
hydraulic flow to recommended rpm.

43

5.

Engage hydraulic drive via seed
monitor. Refer to seed monitor manual.

-

6.

If planter has a fertilizer system
integrated with the DICKEY-john

®

seed

monitor, set the “Fert.Pump” switch on
the Clutch Folding Module to ON.

44

7.

In the CLUTCH cluster of the Clutch
Folding Module, set all switches,
including Master, to ON.

39

8.

Pull forward, lower planter, and begin
planting for a short distance.

9.

Stop. Assess:
• planting depth

• seed spacing

• press wheel operation

• fertilizer application (if in use)

10. Make necessary adjustments

50

Figure 55

Clutch Folding Module: Planting

Configuration

29768

Skip and Double Checks
A. Dig up seed (or plant shallow with press wheel tied

up). Check seed spacing against charts.

B. With meters still charged with air, carefully inspect

disks at several rows.

Inspect the arc from just after the top tuft brush to
the bottom edge of the seed drop brush. Look for
cells (seed pockets) having no seed, or more than
one seed. You may need a flashlight to perform this
inspection.

Sharp Field Turns Checklist

Page

1.

Fold marker

38

2.

Raise planter

26

3.

Make turn

4.

Lower planter

26

5.

Unfold marker on next-row side.

38

6.

Resume planting.

Suspending Planting Checklist

Page

1.

Stop tractor

2.

Fan hydraulic circuit to Float or Neutral

44

3.

Raise planter

26

4.

Fold Marker

38

Ending Planting Checklist

Page

1.

Suspend operations as above, then

2.

Install lift locks

30

3.

Lights ON

-

4.

Transport

Transp

ort