Field operation – Great Plains 3P4025AH Operator Manual User Manual
Page 41

Great Plains Manufacturing, Inc.
Operating Instructions
37
2014-07-29
411-099M
Field Operation
Perform all steps in “Pre-Start Checklist” on page 21
and “Field Set-Up Checklists” on page 36.
Consult seed monitor for alarms during planting. Check
that reported rates are consistent with your plan.
When reloading seed, check consumption against
anticipated use to that point.
First Pass Operation Checklist
Page
1.
Shutters set.
2.
Raise planter and line up at start of first
planting row.
3.
Prime meters with seed.
Leave fan running.
4.
Pull forward, lower planter, and begin
planting for a short distance.
5.
Stop. Assess:
• planting depth
• seed spacing
• press wheel operation
-
6.
Make necessary adjustments
7.
Resume planting.
-
Suspending Planting Checklist
Page
1.
Stop tractor
-
2.
Fan hydraulic circuit to Float or Neutral
3.
Raise planter
Ending Planting Checklist
Page
1.
Suspend operations as above, then
2.
Lights ON
-
3.
Transport
- 1200 Parts Manual (210 pages)
- 706NT Material Rate (46 pages)
- 706NT Material Rate (50 pages)
- 2N-2410 Operator Manual (56 pages)
- 2N-2410 Operator Manual (48 pages)
- 12 Series Drills Assembly Instructions (6 pages)
- X-PresS 2006 Assembly Instructions (50 pages)
- TM500 Operator Manual (62 pages)
- 2010HDP Operator Manual (166 pages)
- YP1630F Material Rate (42 pages)
- YP2425 Operator Manual (162 pages)
- 3S-5000 Operator Manual (94 pages)
- 3PYP Operator Manual (188 pages)
- 3N-3010P Assembly Instructions (2 pages)
- 3N-3010 Assembly Instructions (9 pages)
- 3N-3010P Assembly Instructions (9 pages)
- PFH-15 Predelivery Manual (23 pages)
- PFH-15 Operator Manual (26 pages)
- PFH-15 Operator Manual (46 pages)
- P15126 Serial No 12724 (34 pages)
- DVN 8321 Operator Manual (38 pages)
- 3P500 Assembly Instructions (22 pages)
- 3P600 Assembly Instructions (12 pages)
- 605NT Assembly Instructions (8 pages)
- 605NT Assembly Instructions (4 pages)
- CPH-12 Assembly Instructions (3 pages)
- YP1625A-2420 24 Row 20-Inch Quick Start (6 pages)
- 8323 FCF Predelivery Manual (124 pages)
- P13937 (20 pages)
- 3323 DH Parts Manual (114 pages)
- YP3025-1820 25 Series 18 Row 20 Inch Quick Start (5 pages)
- CF500 Operator Manual (38 pages)
- PFH-15 Assembly Instructions (30 pages)
- 3500TM Parts Manual (106 pages)
- 1800TM Parts Manual (158 pages)
- YP2425A-2470 24 Row 70 cm Quick Start (5 pages)
- Simba Culti Press Operator Manual (38 pages)
- RU1999 Parts Manual (58 pages)
- 3N-30P Assembly Instructions (10 pages)
- 2510HDP Operator Manual (180 pages)
- YP1220 Parts Manual (136 pages)
- 3P500 Material Rate (68 pages)
- YP2425-3620 36 Row 20 Inch Quick Start (5 pages)
- 706NT Operator Manual (53 pages)
- 706NT Operator Manual (22 pages)