Re-install walkboards, Re-install smv reflector, Re-install walkboards re-install smv reflector – Great Plains 3S-5000HD Assembly Instructions User Manual
Page 34
30
3S-5000/F/HD/HDF SGS
Great Plains Manufacturing, Inc.
133-415M
2013-07-30
Re-Install Walkboards
Start with the LH side of the left wing.
Refer to Figure 47 (depicting the right wing, LH side)
129. Select the removed walkboard
that is marked for
the current section and side. Use the lift or hoist to
align it with the extensions (
or
).
Note: Align the walkboard with the outside end of the
section, as the part mating is more obvious there.
130. Select four (4) sets saved or new:
803-020C NUT HEX 1/2-13 PLT
804-015C WASHER LOCK SPRING 1/2 PLT
802-034C HHCS 1/2-13X1 1/4 GR5
Insert the bolts
from the left, through both
aligned parts. Secure with lock washers
, and
nuts
.
Repeat step 129 and step 130 for each section side.
Fold down ladders when all walkboards are installed.
Re-Install SMV Reflector
Refer to Figure 48
131. Select one saved:
818-055C DECAL SLOW MOVING-GALV. BACKED
and two sets saved or new:
802-004C HHCS 1/4-20X3/4 GR5
804-006C WASHER LOCK SPRING 1/4 PLT
803-006C NUT HEX 1/4-20 PLT
Position the SMV
on the center small seed box
mount weldment
of the center section. Secure
with bolts
, lock washers
and nuts
.
21
25
U
D
B
F
R
L
17
17
25
21
6
181
Figure 47:
Re-Install Walkboard
34601
181
182
21
25
17
21
25
17
Figure 48:
SMV Placard Mount
34600
U
D
F
B
L
R
136
20
24
30
16
30
16
24
20
30
136
16
24
20