Preparation, Assembly, Setup – Great Plains CTA4000 Predelivery Manual User Manual
Page 9: Tools required, Pre-assembly checklist, Assembly setup, Tools required pre-assembly checklist

2013-08-21
160-037Q
Great Plains Manufacturing, Inc.
Preparation
5
Preparation
Step-by-step instructions for assembling the implement
begin in the next section of the manual. Before
commencing work, review the Tools Required and
Pre-Assembly Checklist to make sure you have all
necessary parts and equipment.
The implement is shipped via flat bed truck. It is the
dealer’s responsibility to unload the new machine.
Unload all equipment before beginning assembly.
Do not attempt any assembly work while the implement is on
the truck.
The general sequence is:
Assembly
1.
Unload frame sections from truck.
2.
Assemble wings to center section.
3.
Mount caster wheels.
4.
Mount tires.
5.
Mount fold cylinders.
6.
Mount valve, hoses and fittings.
Setup
7.
Hitch leading air cart.
8.
Connect hydraulics.
9.
Bleed hydraulics.
10. Adjust eyebolts.
11. Install towers.
12. Install primary seed hoses.
13. Install secondary seed hoses.
14. Install accessories.
Tools Required
• Forklift or overhead hoist with 6,500-pound (3000 kg)
capacity
• A tractor of sufficient size and horsepower with remote
hydraulics. Refer to “Specifications and Capacities”
in the Operator’s Manual.
• General hand tools
• Jack stands or blocks and safety chain
Note: You will need about 7 gallons (26.5 liters) of
hydraulic oil to refill the tractor hydraulic reservoir
after initial bleeding and cycling of the hydraulic
systems.
Pre-Assembly Checklist
15. Read and understand “Important Safety
Information” on page 1 before assembling.
16. Have at least two people on hand while assembling.
17. Make sure the assembly area is level and free of
obstructions (preferably an open concrete area).
18. Have all major components accounted for.
19. Have all fasteners and pins shipped with implement.
20. Have a copy of the implement Parts Manual
(160-037P or 160-269P) on hand. If unsure of proper
placement or use of any part or fastener, refer to the
parts manual.
21. Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
22. Check that all safety labels and reflectors are
correctly located and legible. Replace if improperly
located or damaged. Refer to Safety Decals, in the
“Important Safety Information” section of the
implement Operator’s Manual.
23. Inflate tires to recommended pressure as listed on
the “Tire Inflation Chart” on page 30.