Operation, Pre-operational checklist, Auger drive & lockout procedure – Wheatheart GHR 80/100 x 31-71ft Augers EMD User Manual
Page 41

W
HEATHEART
- G
RAIN
A
UGER
EMD
5. O
PERATION
GHR 80
X
31’-71’ & 100
X
31’-71’
5.1. P
RE
-O
PERATIONAL
C
HECKLIST
30642 R0
41
5. Operation
5.1. PRE-OPERATIONAL CHECKLIST
Before operating auger each time, the operator must confirm the following:
• All fasteners are secure as per assembly instructions.
• Drive belt(s) are not frayed or damaged.
• Drive belt(s) are properly adjusted and aligned.
• Lift cable is not frayed or damaged.
• Lift cable is properly seated in cable sheaves.
• Cable clamps are secure.
• Tube alignment is reasonably straight.
• Auger wheels are chocked.
• Intake area and discharge spout are free of obstructions.
• Proper maintenance has been performed.
• All safety guards are in place and secure.
5.2. AUGER DRIVE & LOCKOUT PROCEDURE
Warning: Before continuing, please reread the safety information relevant to this section at
the beginning of this manual. Failure to follow the safety instructions can result in serious
injury, death, or property damage.
Drive Type
Before Operation
Lockout
Electric Motor
Before starting motor, ensure
• motor is properly grounded
• pulley guards are in place and
secure
The electric motor should be
equipped with a main power
disconnect switch capable of being
locked in the off-position only. The
switch should be in the locked
position during shutdown or
whenever maintenance is performed
on the auger.
If reset is required, disconnect all
power before resetting motor.