1.3.2 Power Requirements
The Sentinel requires 120 VAC, 8 Amps service. In applications where barrier gates are to be used, each
gate requires 120 VAC, 5 Amps service. The Sentinel and gate must be powered from separate circuits.
Note:
Ensure the protective earth ground wires do not carry any motor return current. Only
the neutral wire should carry return current. Follow local electrical code when wiring
the Sentinel. All units should be installed by a professional electrician ONLY.
1.3.3 Site Wiring Requirements
Wiring requirements will vary by site depending on the type of wash equipment and the Sentinel
configuration. The following table shows site wiring, which may be needed. As wires are pulled through
conduit, ensure there is at least 6 ft. of wire extending from the end of the conduit stub.