1 site planning and preparation, 1 introduction, Site planning and preparation – Unitec Sentine Installation Manual User Manual
Page 5: Introduction

S E N T I N E L
Document Number: SENT1001
1
1
Site Planning and Preparation
1.1 Introduction
This chapter provides guidelines for planning the Sentinel installation and preparing the site. Site
preparation includes:
• Determining how and where the Sentinel will be mounted
• Installing conduit runs and required wiring
These instructions serve as general guidelines only. If your wash manufacturer’s installation requirements
differ from these guidelines, always meet the wash manufacturer’s requirements first.
Requirements specified in local electrical and building codes must be followed and shall take precedence
over the guidelines provided within this document. All units should be installed by a professional electrician
ONLY.
The Sentinel is rated for the following environmental specifications:
• Temperature: -20° F to 115° F
• Humidity: 0% to 100%
The following symbol is used in the Sentinel:
This symbol represents the presence of earth-grounded equipment.
Document Name: Sentinel Installation Manual