CUTMASTER A40

Manual 0-4978

INSTALLATION

3T-1

SECTION 3 TORCH:

INSTALLATION

3T.01 TORCH CONNECTIONS

If necessary, connect the torch to the Power Supply. Connect

only the Victor Thermal Dynamics model SL100SV / Automa-

tion, SL100 / Mechanical or SL60 / Manual Torch to this power

supply. Maximum torch leads length is 100 feet / 30.5 m,

including extensions.

WARNING

Disconnect primary power at the source before

connecting the torch.

1. Align the ATC male connector (on the torch lead) with

the female receptacle. Push the male connector into

the female receptacle. The connectors should push

together with a small amount of pressure.

2. Secure the connection by turning the locking nut

clockwise until it clicks. DO NOT use the locking nut

to pull the connection together. Do not use tools to

secure the connection.

1

2

Art # A-07885

Connecting the Torch to the Power Supply

3. The system is now ready for operation.

Check Air Quality

To test the quality of air:

1. Put the ON / OFF

switch in the ON (up) posi-

tion.

2. Put the Function Control switch in the SET

posi-

tion.

3. Place a welding filter lens in front of the torch and turn

ON the air. Do not start an arc!

Any oil or moisture in the air will be visible on the lens.

3T.02 CNC CONNECTION

1. Locate the interface connection port on the rear of the

power supply.

Automation Interface
Cable Port

Art # A-08322

2. Note the pin-out of the connector and that the customer

supplied connector matches.

Art # A-08323

Plasma

Start / Stop

Signal

Cutting Machine

OK to Move

There are three options for Divided Arc Voltage signal

supplied from the pcb. This is selected by connecting

the black Jumper Plug on the P1 connector as follows:

Arc voltage / 16.67 Jumper not installed

Arc voltage / 30 Jumper Pins 1 & 2

Arc voltage / 50 Jumper Pins 2 & 3