Kessler crane - kc-12 instructions p2.pdf – Kessler Crane: KC-12 User Manual
Page 2
Page 2
STEP 1
Begin by positioning each section. The T-Bar (control
rod) should be underneath each frame section (base &
tip).
STEP 2
Slide the coupler bars into the base section of the
crane, aligning the holes with the hole of the frame.
Then, slide the first cable support over the aligned
frame. Use a ¼”-20 bolt and nut to secure it but do not
tighten.
STEP 2B
If you have purchased the optional Tool Less Kit, slide
the first cable support over the aligned frame. Use a 1
½” threaded knob to secure it. Place the female
threaded knob on the inside of the frame. Leave the
knobs loosened.
STEP 3
Leaving the supports in a loosened state, slide the mid
section onto the base section. Use the ¼”-20 bolts and
nuts to fasten and leave them loosened. Making sure
the frame sections are tight, tighten the bolts.
STEP 3B
If you have purchased the optional Tool Less Kit, leave
the supports in a loosened state, slide the mid section
onto the base section, use the ½” threaded knobs to
fasten and leave them loosened. Make sure the frame
sections are tight, secure the outside knobs first, fol-
lowed by the inside.
KC-12
ASSEMBLY INSTRUCTIONS