beautypg.com

Kessler crane - kc-12 instructions p2.pdf – Kessler Crane: KC-12 User Manual

Page 2

background image

Page 2

STEP 1

Begin by positioning each section. The T-Bar (control

rod) should be underneath each frame section (base &

tip).

STEP 2

Slide the coupler bars into the base section of the

crane, aligning the holes with the hole of the frame.

Then, slide the first cable support over the aligned

frame. Use a ¼”-20 bolt and nut to secure it but do not

tighten.

STEP 2B

If you have purchased the optional Tool Less Kit, slide

the first cable support over the aligned frame. Use a 1

½” threaded knob to secure it. Place the female

threaded knob on the inside of the frame. Leave the

knobs loosened.

STEP 3

Leaving the supports in a loosened state, slide the mid

section onto the base section. Use the ¼”-20 bolts and

nuts to fasten and leave them loosened. Making sure

the frame sections are tight, tighten the bolts.

STEP 3B

If you have purchased the optional Tool Less Kit, leave

the supports in a loosened state, slide the mid section

onto the base section, use the ½” threaded knobs to

fasten and leave them loosened. Make sure the frame

sections are tight, secure the outside knobs first, fol-

lowed by the inside.

KC-12
ASSEMBLY INSTRUCTIONS