beautypg.com

Warning – Burnham RSA User Manual

Page 13

background image

3

and return line as illustrated in Figures 8 and 9

in order to regulate water flow for maintenance

of higher boiler water temperature. Set the

bypass and return valves to a half throttle

position to start. Operate boiler until the system

water temperature reaches its normal operating

range. Adjust the valves to maintain 180°F to

200°F boiler water temperature and greater the

120°F return temperature. Adjust both valves

simultaneously. Closing the boiler return valve

while opening the bypass valve will raise the

boiler return temperature. Opening the boiler

return valve while closing the by-pass valve will

lower the boiler return temperature.

e. A water boiler installed above radiation level

must be provided with a low water cutoff device

as part of the installation.

If a low water cut-off is required, it must be

mounted in the system piping above the boiler.

The minimum safe water level of a hot water

boiler is just above the highest water containing

cavity of the boiler; that is, a hot water boiler

must be full of water to operate safely.

B

. Install Safety Relief Valve. See Figures 8 and 9.

Safety Relief Valve must be installed with spindle in

the vertical position. Installation of the relief valve

must be consistent with ANSI/ASME Boiler and

Pressure Vessel Code, Section IV.

WARNING

Safety (relief) valve discharge piping must be

piped near floor to eliminate potential of severe

burns. Do not pipe in any area where freezing

could occur. Do not install any shut-off valves,

plugs or caps.

C.

Install Drain Valve in return piping. See Figures 8 and

9.

D

. Oil, grease, and other foreign materials which

accumulate in new hot water and a new or reworked

system should be boiled out, and then thoroughly

flushed. A qualified water treatment chemical specialist

should be consulted for recommendations regarding

appropriate chemical compounds and concentrations

which are compatible with local environmental

regulations.

E

. After the boiler and system have been cleaned and

flushed, and before refilling the entire system add

appropriate water treatment chemicals, if necessary, to

bring the pH between 7 and 11.

WARNING

Installation is not complete unless a safety relief valve is installed as shown in Figure or A.