Model 5600se downflow, Control start-up procedures (cont’d.), Fast cycle regeneration – Watts Fleck 5600 Plastic Valve User Manual
Page 8
![background image](/manuals/590862/8/background.png)
Model 5600SE Downflow
8
Control Start-Up Procedures (Cont’d.)
5. Push the Extra Regeneration button.
6. Set Regeneration Day Override. Use the Set Up or Set Down buttons to set the maximum number of days before a
regeneration cycle must occur.
7. Push the Extra Regeneration button to exit the program.*
*Fast Cycle Regeneration
Perform the following Fast Cycle Regeneration if setting up the system for the first time:
1. Push the Extra Regeneration button for 5 seconds to force an extra regeneration immediately.
2. Once the valve reaches Regeneration, step 1, let water run to drain for approximately 5 minutes.
3. Push the Extra Regeneration button once to advance valve to Regeneration, step 2.
4. Push the Extra Regeneration button once to advance valve to Regeneration, step 3 (if active).
5. Push the Extra Regeneration button once to advance valve to Regeneration, step 4 (if active).
6. Push the Extra Regeneration button once to advance valve to Regeneration, step 5 (if active)
7. Push the Extra Regeneration button once more to advance the valve back to In Service.
Figure 6: Regeneration Day Override
Regeneration every
7 days minimum