LD-Series Motor Installation Instructions 5

Publication LD-IN001A-EN-P — September 2000

Building and Installing Cables

Knowledgeable cable routing and careful cable construction improves
system ElectroMagnetic Compatibility (EMC).

To build and install cables, perform the following steps:

1. Keep wire lengths as short as physically possible.

2. Route signal cables (encoder, serial, analog) away from motor and

power wiring.

3. Separate cables by 0.3 m (1 ft) minimum for every 9 m (30 ft) of parallel

run.

4. Ground both ends of the encoder cable shield and twist the signal wire

pairs to prevent electromagnetic interference (EMI) from other
equipment.

ATTENTION

!

High voltage can be present on the shield of a
power cable, if the shield is not grounded.

Ensure there is a connection to ground for any
power cable shield.

Failure to observe these safety procedures could
result in personal injury or damage to equipment.