background image

CIRCUIT

BREAKER

BOOT

PLATE

INSTALLED

Figure 5 - Three Phase MinPak Plus Operators

Control Station Installed

Figure 6 - Local Faceplate Connectors

LOCAL

OPERATOR'S

CONTROL

CONNECTS

HERE

J9

J8

J4

J10

Figure 7 - Three Phase MinPak Plus Regulator Board Jumper Location

Reliance Electric Company / 24703 Euclid Avenue / Cleveland, Ohio 44117

RELIANCE ELECTRIC

Printed in U.S.A.

DĆ3977