Rockwell Automation MinPak Plus Local Operator Station Faceplate Kit 14C201-208 User Manual
Page 3
MINPAK PLUS
STANDARD BLANK
FACEPLATE
Figure 2 - Three Phase MinPak Plus With
Standard Blank Faceplate
CHASSIS
GROUND
WIRE
Figure 3 - Three Phase MinPak Plus With
Chassis Ground Wire Mounted to
Local Operators Control Cabinet Door Faceplate
AREA TO
BE CLEANED
WITH ALCOHOL
CIRCUIT
BREAKER
BOOT
Figure 4 - Local Faceplate With All Options
6. Pass the2 wireharnesses through theCover cutĆ
out, align the threaded studs with the holes, and
press the Faceplate into place. Check for an even
seating on the gasket.
7. Attach and tighten all 8 hex nuts until the Faceplate
bottoms out on thestops built into theCover. Use
an alternating pattern when tightening, but tighten
all nuts evenly. Attach the ground (green) wire to the
Faceplate with the standard nut provided. (Refer to
Figure3).
DANGER
IT IS NECESSARY TO ATTACH THE FACTORY
CHASSIS GROUND WIRE TO THE CONTROLĆ
LER CABINET DOOR VIA THE LOCAL OPERAĆ
TOR STATION FACEPLATE, PERSONAL INJUĆ
RY MAY RESULT IF THIS PRACTICE IS NOT
FOLLOWED.
CAUTION: CIf theOperator's Control Station FaceĆ
plate is not properly seated and firmly tightened,
theNEMA Type12 rating of thecontroller cannot be
maintained. Makesurethereis a firm seating
against thegasket.
8. Locatethearea on theRegulator Modulewherethe
2 connectors will connect. (Refer to Figure 6 and
Figure7). Notethereare2 sets of pins. Matethe
connector with thered wirein theend position conĆ
necting to the pin marked 32 (RED).