beautypg.com

Rockwell Automation 2094-PRx Kinetix 6000 Power Rail Installation Instructions User Manual

Page 5

background image

Kinetix 6000 Power Rail 5

Publication 2094-IN003D-EN-P - November 2010

Follow these steps to mount your 2094-PRS

x or 2094-PRx power rail.

1. Lay out the position for your power rail in the enclosure.

Refer to your servo drive user manual for panel layout recommendations. Mounting hole
dimensions for the power rail are shown in the figures on

page 6

.

2. Attach the power rail to the cabinet.

The recommended mounting hardware is M6 metric (1/4x20) bolts. Refer to the System
Design for Control of Electrical Noise Reference Manual, publication

GMC-RM001

,

for HF bonding techniques.

3. Tighten all mounting fasteners.

Apply 5.08 N•m (45.0 lb•in) torque.

4. Attach the braided grounding strap from the grounding stud to the bonded cabinet

ground.

IMPORTANT

To improve the bond between the power rail and subpanel, construct
your subpanel out of zinc plated (paint-free) steel.

LIM

PRS

PR

Bonded Cabinet Ground Bus

2094-PRSx or 2094-PRx Power Rail

(2094-PRS8 power rail is shown)

2094-PRSx or 2094-PRx Power Rail

on Bulletin 2094 Mounting Brackets

(2094-PRSx power rail is shown)

Ground Grid or Power
Distribution Ground

Braided Ground Strap, 100 mm (3.9 in.)

Braided Ground Strap, 100 mm (3.9 in.)

Ground Stud

Ground Stud

2094-XNBRKT-1 Mounting Bracket

Bonded Cabinet Ground Bus

Ground Grid or Power
Distribution Ground

This manual is related to the following products: