beautypg.com

I/o ports, Installing the battery, I/o ports installing the battery – Rockwell Automation 2727-T7P30D1Fxx MobileView Tablet T750 Quick Start User Manual

Page 3

background image

MobileView™ Tablet T750 3

Publication 2727-QS004B-EN-P - September 2004

I/O Ports

Top End

Foot Switch
Port

RF Antenna

Infrared Port

Digital Gage Port

Barcode Port

Bottom End

External Audio

Video/Monitor Connector

Notification
LEDs

USB Ports

External Power
Receptacle

RS-232 Port

Battery Pack

Reset Button

Installing the Battery

1. Slide the battery into the battery

compartment until the battery cover plate is
flush with the Tablet case, then slide the
cover plate up. You should feel the battery
snap into place.

Install only the battery supplied with your MobileView Tablet.
Use of any other battery could result in a hazard to the
operator and damage to equipment.

ATTENTION