beautypg.com

Wire the junction box – Rockwell Automation 1788-FBJB6 Foundation Fieldbus Junction Box Installation Instructions User Manual

Page 8

background image

8 FOUNDATION Fieldbus Junction Box

Rockwell Automation Publication 1788-IN006A-EN-P - September 2014

Wire the Junction Box

Use IEC61158-2 cable color coding for wiring the FOUNDATION Fieldbus
and device connectors as shown in the figure. Do not wire more than one
conductor on any single terminal.

WARNING: Temperature rating of conductors must be greater than 82 °C (179.6 °F).

1 2 3

1

2

3

Red

Green

FB+

FB-

Shield

This manual is related to the following products: