beautypg.com

Chapter 2, Installation, Installation check list – Rockwell Automation 1608P HC-DySC Installation Instructions, 200 A User Manual

Page 7: Inspecting and unpacking, Location (environment), System components, Chapter

background image

Rockwell Automation Publication 1608P-UM004A-EN-P - September 2013

7

Chapter

2

Installation

Installation Check List

Before proceeding, please take a few minutes to review the necessary steps to
install your HC-DySC.

All packing materials and restraints have been removed.

The HC-DySC is placed in its installed location.

All conduits and cables are properly routed to the HC-DySC.

All power cables are properly terminated.

A ground conductor is properly installed and terminated.

If neutral connection is required that it is properly terminated on the
HC-DySC.

The area around the installed HC-DySC is clean and dust-free.

Adequate work space exists around the HC-DySC.

Adequate lighting is provided around the HC-DySC.

Operational checks have been reviewed and completed.

Inspecting and Unpacking

Lift only at the base with a fork truck or pallet jack.

Carefully inspect the outer packaging for evidence of damage during
transit. Do not install a damaged cabinet. Report any damage to the carrier
and contact your local sales or service immediately.

Check the HC-DySC label for correct model number with the packaging
list to ensure you have received the correct voltage, current, and wiring
configurations.

After removing the packaging material, inspect the contents for any
evidence of physical damage, and compare each item with the Bill of
Lading. If damage has occurred or shortages are evident contact your
carrier immediately.

Location (Environment)

The HC-DySC must be installed in a protected environment. The location must
provide adequate airflow around the HC-DySC in an atmosphere free from
excessive dust, corrosive fumes, or conductive contaminants. Do not operate the
HC-DySC in an environment where the ambient temperature or humidity is
beyond the specified limits given in this manual.

System Components

The HC-DySC consists of a single enclosure with an integral mechanical bypass
to prevent power disruption during service and maintenance.