Before operating the unit, Caution, Precautions when installing the unit – Yamato Scientific DVS602 Constant Temperature Drying Oven User Manual
Page 9: Installation, Placing shelf boards and samples
7
2. Before operating the unit
Precautions when installing the unit
Caution
8. Be sure to connect the power plug to the dedicated wall outlet.
Use a power distribution panel or a wall outlet that meets the electrical capacity of the unit.
DVS402
AC100V
12.5A
Electric capacity:
DVS602
AC100V
14A
When the unit will not start even when you turn the power switch to “ON”, check for low
main voltage or if the unit is connected to the same power supply line as other devices and
connect it to another line if necessary.
9. Installation
The unit might fall down or move by an earthquake or an impact resulting a personal injury.
We recommend making safety measures such as to avoid installing the unit at a place
other than busy places.
Also, take appropriate safety measures to prevent the unit from tripping over.
10. Placing shelf boards and samples
Two shelf boards are included with this product.
One of them has been fixed on the lowest stage of the shelf pillar of the internal bath at the
time of shipping from the factory.
Set another board to an appropriate position in the bath.
A heater is installed under the flow adjusting board. Thus, the temperature of the flow
adjusting board and around it is always higher than the set temperature and placing a
sample directly on the board may damage it or cause a fire.
Therefore, the shelf board is fixed with screws as shown to disable direct placement of
samples.
Because of the shape of samples, when the unit is operated with shelf boards removed to
accept them, assure sufficient space between them and the flow adjusting board and never
place samples directly on the flow adjusting board.
Shelf pillar
Flow adjusting
board
Clamp
Screw
Screw
Shelf board