beautypg.com

USG DONN Ceiling User Manual

Page 2

background image

Page 2 of 7

Install Your Ceiling, Step by Step

1. Choose the ceiling height — Install

your ceiling at any level, as long as you

maintain enough clearance (3 in. or 75

mm is recommended) below the lowest air

duct, pipe, or beam to install panels. Mark

the desired height at each room corner.

5. Locate main tees — Stretch a string

across the room at ceiling height to

locate each main tee. To do this, pull the

string taut around nails that are inserted

between the wall and the wall angle at

opposite wall locations.

6. Locate cross tees — Stretch a string

perpendicular to the main tee strings

where you want to locate the first row of

cross tees. You only need to do this once,

since prepunched slots in the main tees

ensure spacing of subsequent rows of

cross tees.

7. Install hanger wires — Install screw

eyes, with hanger wires attached, every

4 ft. (1220 mm) along main tee string

lines. The wires should extend 6 in.

(150 mm) below the string line.

8. Bend hanger wires — Use pliers to

bend a 90° angle in all hanger wires at

a point 3/4 in. (19 mm) above the string.

If the nearest hanger hole is not directly

below the screw eye, adjust the hanger

accordingly.

2. Mark a perimeter chalk line — Snap a

chalk line around the entire room perimeter,

3/4 in. (19 mm) above your desired ceiling

height. Check it with a carpenter’s level.

Measuring alone, either down from joists

or up from the floor, is not recommended,

since either might not be level.

3. Install wall angles — Align the top edge

of the wall angle with the chalk line and

nail wall angles around the entire room.

Nail at each stud location or at a minimum

of 2-ft. (610 mm) intervals.

4. Cut off the corners — At inside corners,

cut wall angles straight (90°) and butt them

together. At outside corners, miter them

(45°) and fit snugly together,

or use corner caps.

Tools and Materials

Plan Your Ceiling

Before installation, plan the process by drawing the room to scale on a sheet of graph paper:

1. Locate room center line: Determine the room center line (preferably perpendicular to the ceiling joists) and draw it on the graph

paper� Aligning main tees perpendicular to the ceiling joists will make installation easier�

2. Locate main tees: On the graph paper, mark off 4-ft� (1220 mm) intervals across the room width, beginning at the center line and

going to each side wall� If more than 2 ft� (610 mm) remain between the last mark and the side wall, locate main tees at these marks�

If less than 2 ft� (610 mm) locate main tees at 4-ft� (1220 mm) intervals beginning 2 ft� (610 mm) either side of the center line� This

procedure helps ensure symmetrical border panels of the largest possible size and the most efficient use of material�

3. Locate cross tees: To locate cross tees, draw lines at 2-ft� (610 mm) intervals perpendicular to main tees� For economy,

appearance, and equal border panels, begin at the center of the room, using the same procedure as in #2 above� This completes
planning for the basic 2 x 4-ft� (610 x 1220 mm) ceiling grid�

4. For a 2 x 2-ft. (610 x 610 mm) grid pattern: Simply indicate additional 2-ft. (610 mm) cross tees bisecting each

2 x 4-ft. module.

5. Check your pattern: If upon completing your plan, your border panels are less than 1/2 of a full panel, adjust your tee

locations to ensure symmetry with the largest border panels possible.

6. Check your materials: From the diagram, determine the number of pieces of wall angle, main tees, cross tees, and ceiling

panels required to be sure that you have purchased enough. Main tees come in 12-ft. (3660 mm) lengths, cross tees in 4-ft.
[1220 mm] lengths (additional 2-ft. [610 mm] cross tees are required if 2 x 2-ft. [610 x 610 mm] panels are used) and wall
angles in 10-ft. lengths (sometimes 12-ft. [3660 mm] lengths). Also, you will need one hanger wire and screw eye for every
4 ft. (1220 mm) of main tees.

In addition to USG C

eilings

materials,

you’ll need some other supplies and

a few hand tools:

– Screw Eyes, Anchors, or Hanger Wire Hooks—

For suspending ceiling from joists at 4-ft�
(1220 mm) intervals� Determine quantity from
your plan�

– Hanger Wire—Buy one 18-ga� wire for each
screw eye� (12-ga� for commercial projects�)
– 6d (six-penny) Common Nails
– Carpenter’s Square
– Utility Knife
– Hammer
– Pliers
– String
– Tape Measure
– Level
– Hacksaw or Metal Snips
– Chalk Line
– Safety Glasses