GENERAL PRECAUTIONS

After completing the installation, recheck the following:

6.1

The drain pans, fans and motors are clean of all foreign material.

6.2

All electric wiring is properly routed, secure and capped.

6.3

The filter, where provided, is clean and secured in its position.

7.

INITIAL START-UP

7.1

Chilled/Hot Water Unit

7.1.1

Ensure that the main distribution system is operable (i.e. both supply and return piping

are under full operating pressure).

7.1.2

Open the unit’s isolating ball valves (optional) and observe that no leaks are evident.

7.1.3

Open the 2-Way or 3-Way Valve (optional) manually by turning the manual override

to the open position on the valve actuator thus pressurizing the unit’s coil.

7.1.4

Remove the cap of the air-vent valve and depress the needle to release the trapped air.

Continue until only liquid is coming through and then re-cap and secure tightly.

8.

OPERATION AND CONTROL

8.1

The unit is wired to operate with a four-position fan selector switch:

OFF

HI

High fan speed

MED

Medium fan speed

LO

Low fan speed

8.2

An external thermostat (normally wall mounted) is used to select the desired room

temperature.

8.3

Where the unit is provided with electric heating (optional), the external HEAT/COOL

changeover switch has to be set in the HEAT position to enable the thermostat to

switch the heater ON when the room temperature drops below the set point.