Hepa, Kit installation manual, Installation – Titus HEPAlert IOM for RadiaTec Diffusers User Manual
Page 2
HEPA
LERT
Kit Installation Manual
IOM-HEPA-RT-00
725343-01
09-30-04
2 of 7
Installation
1.
Determine and mark hole locations in back pan
(see Figure 1). Before drilling holes, position the
base bracket on back pan to verify alignment of
marked holes to bracket openings. Drill holes and
insert grommet into the 5/8-inch diameter hole.
2.
Determine and mark hole locations on HEPA filter
frame (see Figure 2). Before drilling frame holes,
verify the marked holes align directly under the
back pan holes in final installation. Insert grommet
into the 5/8-inch diameter hole.
3.
Determine LED bracket placement on the back
pan. Drill mounting holes on the side of back pan
(see Figure 3). The holes should be on the side of
the back pan adjacent to the holes drilled in Steps
1 and 2.
Figure 1. HEPA
LERT
Kit Hole Placement
Contaminants
Figure 2. HEPA Filter Frame Hole Locations
4.
Secure the pressure switch and terminal barrier
strip to base bracket using pan head screws and
hex nuts (see Figure 4).
5.
Secure base bracket to back pan using self-tapping
screws (see Figure 5).
Figure 3. RadiaTec Hole Placement for LED Bracket
Figure 4. Base Bracket with Pressure Switch and
Terminal Barrier Attached
Figure 5. HEPA
LERT
Base Attached to Back Pan