beautypg.com

J14 j12 – SATEC SA300 ezPAC Installation Manual User Manual

Page 14

background image

Chapter 2 Installation

11

-

-

-

-

-

-

N

K

-

+

L

K
+

-

L

K

+

-

L

+

+

+

+

+

+

K

L

-

+

PT

I

-

-

I

-

-

I

-

-

I

-

-

+

-

1

2

3

4

+

-

+

-

+

-

CT

02-04014

MEASUREMENT

4N

INPUT VOLTAGE

V

1

V

J9

1

V

3

V

2

3

2

V

V

N

4

5

4

6

SW1

1

9

6

JDR1

COM1

RS-232

5

1

1

RS-422/485

IRIG-B

J7

4

-Tx

J3

2

+Rx

1

+Tx

3

3

2

2

5

-Rx

4

5

3

6

12V GND

-

+

RDM

SUPPLY

MAIN POWER

GROUND

MEASURE

VDC

BACKUP

POWER SUPPLIES

MAIN

-

+

N/-

2

125/220V DC

J10

DC

+

1

N/-

L/+

-

SW2

3

4

L/+

5

6

OR 120/230V AC

125/220V DC

NOT CONNECTED

8

1

RS-485

ETHERNET

RS-422/485

MODEM

JP3

1

4

J1

COM2

7

8

4

+Rx

+Tx

1 2

4

-Rx

3

-Tx

5

1

J2

COM3

3

P.SUPPLY

4

RDM

5

3 2

4

USB

J11

2

3

2

4

1

6

5

7

Switches

Shorting

1

J5

8

LOAD

(B)

LINE 2
LINE 3 (C)

LINE 1 (A)

CURRENT
INPUTS:

SA320 150A

SA310 150A

J14

J12


Figure 2-5
SA310, SA320: Four Wire WYE Connection Using 3 PTs, 4 CTs
(3-element)

Wiring Mode = 4LL4 or 4Ln4