Facility readiness checklist, Facility readiness checklist 33 – MTS Criterion Series 60 User Manual
Page 33

MTS Criterion™ Series 60
33
Facility Readiness Checklist
Physical space is
ready
Make sure that:
•
The facility width, length, and ceiling height are adequate to accommodate
the system (Refer to
and
•
The foundation is prepared correctly (refer to
•
The doors and corridors are large enough to accommodate the system.
Utilities are in place
Make sure that:
•
Qualified electrical power is available (refer to
.
•
Qualified hydraulic oil is available (refer to A1.3 of
the
Installation and
Commissioning Plan)
.
•
Arrangements have been made to have trades personnel (electrician,
plumber, and so on.) available to make final connections.
The equipment has
been uncrated and
moved into its final
position
•
The load frame has been uncrated and anchored to the foundation and
leveled according to
Lifting and Moving Instructions.
•
The Integrated Operations Platform has been uncrated and moved to its final
position and leveled according to
Lifting and Moving Instructions.
•
The accessories (fixtures, steps, safety enclosure, and so on.) are stored
correctly.
Access to facility
network is available
•
Make sure the computer network connections are available and IT resources
are available to assign IP addresses and ensure the Internet and Intranet are
accessible.
Customer-supplied
parts are available
•
Make sure all customer-supplied parts and accessories are available and
ready to connect or install. This can include specimen installation fixtures,
environmental equipment, test area guards, and so on.
Specimens are
prepared
•
Make sure you have all the needed specimens ready for system tests and
training.
Staff available for
training
•
Make sure personnel who will manage, operate, and service the equipment
are available during installation for training (refer to
A1.5 of
Installation and
Commissioning Plan)
.