beautypg.com

Moving the load frame with an overhead crane, Moving the load frame with an overhead crane 28, Moving the load frame with an – MTS Criterion Series 60 User Manual

Page 28: Overhead crane

background image

MTS Criterion™ Series 60

28

Handling the Load Fame

4. Secure the load frame to the foundation; see

“Securing the Load frame”

on

page 29.

Moving the Load Frame with an Overhead Crane

If an overhead crane is used, perform the following:

1. Choose suitable slings according to the load frame weight.

2. Attach the slings to the customer-supplied hoist rings on the uppe crosshead.

3. Raise the hook slowly to lift the load frame only high enough to move.

4. Slowly and steadily move the load frame to the foundation.