Pro-loc i,ii, Pro-loc i,ii 11" r – Metal Sales Pro-Loc II Manual User Manual
Page 17

PPL-17
PRO-LOC I,II
© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 9/11
800.406.7387 (Corporate Office) • www.metalsales.us.com
v
enTed
r
idge
d
eTail
Pro-loC i,ii
11" r
idge
/h
iP
d
eTail
3:12 SLOPE
MINIMUM
3:12 SLOPE
MINIMUM
Double Bead Tape Sealant
1
/
8
x
3
/
16
" Pop Rivet (1'-0" o.c.)
#10-12 x 1" PHW (1'-0" o.c.)
Vented Ridge Cover
Moisture Barrier (by others)
Tube Sealant
Pro-Loc Panel
Offset Cleat
Vent Drip
Vent Material
Double Bead Tape Sealant
1
/
8
x
3
/
16
" Pop Rivet (3 per panel)
Pro-Loc Z-Closure
#10-12 x 1" PHW (4 per panel)
Moisture Barrier (by others)
Pro-Loc Panel
Tube Sealant
11" Ridge/Hip Cover
Double Bead Tape Sealant
#14-13 x 1
5
/
8
" Dek Fast (1'-0" o.c.)
#10-12 x 1" PHW (4 per panel)
2"
NOTE: Z-Closures must be field cut and bent to fit between
panel ribs (See Metal Sales Architectural Installation Manual).
NOTE: Z-Closures must be field cut and bent to fit between
panel ribs (See Metal Sales Architectural Installation Manual).
2"