CLIP-LOC
E
AVE
(O
PTIONAL
F
LOATING
) O
VER
O
PEN
F
RAMING
All eave flashings must be installed prior to panel installation.
1. Position and install Cleat to wall with appropriate fastener, 1'-0" o.c. Make sure Cleat allows for proper Eave attachment.
2. Install Eave flashing by sliding open hem onto Cleat and resting the Eave flashing back against eave strut. To hold Eave
flashing in place fasten to substrate with #10-16 x 1" Pancake Head Driller at 1'-0" o.c.
3. Apply a row of Double Bead Tape Sealant across Eave flashing approximately 2” from face of Eave flashing.
4. Properly align and install Clip-Loc Inside Closures to accommodate Clip-Loc panel rib alignment. Closures must be lined up
with panel ribs for proper seal. Do not apply tape sealant on top of closure.
5. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead
of tube sealant between the flashings and securing with pop rivets 2
1
/
2
" o.c.
#10-16 x 1" PHD (1'-0" o.c.)
Eave
Double Bead Tape Sealant
Cleat
Clip-Loc Inside Closure
Clip-Loc Panel
Clip-Loc panel must be anchored to open framing behind outside closure at all ridge, endwall, and peak
conditions to fi x the panel when using this fl oating eave detail.
Clip-Loc Clip
Clip-Loc Clip must be installed at eave for this fl oating eave detail.
3
1
/
2
" MIN.
0"-1
1
/
2
"
#10-16 x 1" PHD (1'-0" o.c.)
1:12 Slope
Minimum
INSTALLATION NOTES