Clip-loc – Metal Sales Clip-Loc Installation User Manual
Page 25

CLIP-LOC
© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 2/03
812.246.1935 (Corporate Offi ce) • www.mtlsales.us.com
24
E
AVE
(O
PTIONAL
F
LOATING
) O
VER
D
ECKING
All Eave flashings must be installed prior to panel installation.
1. Position and install Cleat to wall with appropriate fastener, 1'-0" o.c. Make sure Cleat allows for proper Eave attachment.
2. Install Eave flashing by sliding open hem onto Cleat and resting the Eave flashing back against substrate. To hold Eave flashing
in place fasten to substrate with #10-12 x 1" Pancake Head Woodscrew 1'-0"o.c.
3. Apply a row of Double Bead Tape Sealant across Eave flashing approximately 2" from face of Eave flashing.
4. Properly align and install Clip-Loc Inside Closures to accommodate Clip-Loc panel rib alignment. Closures must be lined up
with panel ribs for proper seal. Do not apply tape sealant on top of closure.
5. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead
of tube sealant between the flashings and securing with pop rivets 2
1
/
2
" o.c.
#10-12 x 1" PHW (1'-0"o.c.)
Eave
Double Bead Tape Sealant
Cleat
Clip-Loc Inside Closure
Clip-Loc Panel
Clip-Loc Clip
Moisture Barrier (by others)
Clip-Loc panel must be anchored to solid deck behind outside closure at all ridge, hip, endwall, and peak
conditions to fi x the panel when using this fl oating eave detail.
#10-12 x 1" PHW (1'-0" o.c.)
0"-1
1
/
2
"
4" Max.
1:12 Slope
Minimum
INSTALLATION NOTES