Step 3 step 4, Clip-loc – Metal Sales Clip-Loc Installation User Manual
Page 46

© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 2/03
812.246.1935 (Corporate Offi ce) • www.mtlsales.us.com
45
CLIP-LOC
I
NSTALLATION
OF
P
ANEL
O
VER
O
PEN
F
RAMING
(
CONT
.)
INSTALLING CLIP-LOC CLIP
INSTALLING SECOND PANEL
STEP
3
STEP
4
Sidelap Section
If roof slope is less than 3:12 apply a continuous row of
1
/
4
" Bead Butyl Sidelap Sealant on top of male leg.
1. If roof slope is less than 3:12,
1
/
4
" Bead Butyl Sidelap Sealant must be placed on top of male leg
in sidelap.
2. Place the second panel on top of previously installed panel so that panel ends are flush at eave.
3. Clip-Loc center rib must be snapped in place first followed by female rib. Start snapping panel at one
end and working to other.
4. Fasten at eave through panel, closure, and sealant into framing with (6) #12-14 x 1
1
/
2
" Self Driller XL
fasteners per panel. Fasteners must penetrate closure and sealant.
5. Repeat steps 3 and 4 for remaining panels.
1
/
4
" Bead Butyl
Sidelap Sealant
If roof slope is less than 3:12 apply a continuous bead of
tube sealant across inside of clip.
1. If roof slope is less than 3:12, apply a continuous bead of tube sealant on inside of clip leg as shown.
Clip is not required at panel eave end.
2. Install clip over male leg of panel as shown. Make sure short leg of clip is over male leg of panel. Clip
spacing is determined from chart on (page 18) or from project design wind uplift requirements. Design
requirements take presidence. Bend down panel barb if necessary for clip to fit male rib.
3. Fasten clip to purlins with number of recommended fasteners shown in chart on (page 18).
4. Refer to chart on (page 18) if installing over rigid insulation.
Clip-Loc Panel
Clip-Loc Clip
Panel Barb
Clip-Loc Fastening Pattern
#12-14 x 1
1
/
2
" SD XL
(6 per panel)