CLIP-LOC
© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 2/03
812.246.1935 (Corporate Offi ce) • www.mtlsales.us.com
40
H
IGHSIDE
E
AVE
(O
PTIONAL
) O
VER
D
ECKING
1. Once panels have been installed, slide Clip-Loc Turn-up Tool over end of panel and bend pan up until flush with top of panel rib.
Turn up all Clip-Loc pans (see page 19).
2. Apply a row of Double Bead Tape Sealant across panel, up and over all ribs approximately 2"-4" from panel end.
3. Install a Clip-Loc Outside Closure over tape sealant. Before continuing make sure closure placement will accommodate Clip-Loc
Peak flashing. Set closure in tape sealant.
4. Once all closures have been installed, place a row of Double Bead Tape Sealant across the top of closures.
5. Place Clip-Loc Peak on top of panel ribs and mark the peak flashing at the center of each panel rib as a guide for notching. Use
Clip-Loc Notching Tool to notch out peak flashing (see page 19).
6. Position and install Cleat to wall with appropriate fastener, 1'-0" o.c. Make sure Cleat allows for proper peak attachment.
7. Install Clip-Loc Peak flashing by sliding open hem onto Cleat and resting the peak flashing back over roof panel.
8. Fasten Clip-Loc Peak flashing to Clip-Loc panel rib with a ¼-14 x
7
/
8
" Stitch XL 8" o.c. at every rib
9. If two or more flashings are required, lap the flashing over the previously installed flashing by a minimum of 2" placing a bead
of tube sealant between the flashings and securing with pop rivets 2
1
/
2
" o.c.
Double Bead Tape Sealant
#
1
/
4
-14 x
7
/
8
" Stitch XL (8" o.c.)
Clip-Loc Panel
Clip-Loc Clip
Cleat
Clip-Loc Outside Closure
Clip-Loc Peak
Double Bead Tape Sealant
#10-12 x 1" PHW (1'-0" o.c.)
1:12 Slope
Minimum
INSTALLATION NOTES
Clip-Loc panel must be anchored to solid deck behind outside closure at all ridge, hip, endwall, and peak
conditions to fi x the panel when using this fl oating eave detail.