Step 1 step 2, Residential panel installation – Metal Sales Pro-Panel II Installation User Manual
Page 38
© Metal Sales Manufacturing Corporation / Subject to change without notice / Effective 5/09.
37
POST FRAME
& RESIDENTIAL
RESIDENTIAL PANEL INSTALLATION
INSTALLING FIRST PANEL
INSTALLING INSIDE CLOSURES
INSTALLING
PANEL CLIP
STEP
1
STEP
2
FASTENER
INSIDE CLOSURE
w/ TAPE SEALANT
TAPE SEALANT
INSIDE CLOSURE
ROOF PANEL
1. Apply a row of Tape Sealant across the top leg of the Eave Molding along the width of
the building.
2. Align and place Inside Closures over the Tape Sealant. It is critical that Inside Closures
are square to building as this will control the alignment of the panels. (See page 24 to
check building square).
3. Apply a row of Tape Sealant across the top of the Inside Closure (Not shown for clarity).
1. Install the first panel over the Inside Closure to allow for desired overhang. Make sure the panel
is square to the eave and rake.
2. Fasten through panel, closure, and sealants into decking with appropriate amount of fasteners to
meet local building code. (See fastening patterns on pages 13 and 14). Fasteners must penetrate
closure and sealant.
3. After securing panel at eave, repeat the fastening pattern at the appropriate spacing to meet local
building codes.
NOTE:
-Eave Molding, Gutter and Valley Flashings must first be installed before panel installation can begin.
-Panels can be installed going from either letf to right or right to left / looking from eave to peak.