Safety – Metal Sales Pro-Panel II Installation User Manual
Page 2
![background image](/manuals/567676/2/background.png)
© Metal Sales Manufacturing Corporation / Subject to change without notice / Effective 5/09.
1
POST FRAME
& RESIDENTIAL
SAFETY
IMPORTANT INFORMATION
STUDY APPLICABLE OSHA AND OTHER SAFETY REQUIREMENTS BEFORE
FOLLOWING THESE INSTRUCTIONS.
The installation of metal roof systems is a dangerous procedure and should be supervised
by trained knowledgeable erectors. USE EXTREME CARE WHILE INSTALLING ROOF
PANELS. It is not possible for Metal Sales to be aware of all the possible job site situations
that could cause an unsafe condition to exist. The erector of the roof system is responsible
for reading these instructions and determining the safest way to install the roof system.
These instructions are provided only as a guide to show a knowledgeable, trained erector
the correct part placement one to another. If following any of the installation steps would
endanger a worker, the erector should stop work and decide upon a corrective action.
Provide required safety railing, netting, or safety lines for crew members working on
the roof.
Do not use the roof panel as a walking platform. The roof panels will not withstand the
weight of a person standing at the edge of the panel.
Do not stand on the roof panel until the panels have been attached.
The application and detail drawings in this manual are strictly for illustration purposes and
may not be applicable to all building designs or product installations. All projects should
conform to applicable building codes for that particular area. It is recommended to follow all
building regulations and standard industry practices.
Metal Sales Manufacturing Corporation is not responsible for the performance of the roof
system if it is not installed in accordance with the suggested instructions referenced in this
installation manual or in the product overview. (See Product Manual or Product Technical
Literature). If there is a conflict between this manual and the actual erection drawings, the
erection drawings are to take precedence.
Prior to ordering and installing materials, all dimensions should be verified by field
measurements.
Metal Sales reserves the right to modify, without notice, any details, recommendations
or suggestions. Any questions you may have regarding proper installation of the roofing
system should be directed to your Metal Sales representative, see pages 2 and 3.
Consult Metal Sales for any additional information not outlined in this manual.
This manual is designed to be utilized as a guide when installing Post Frame and
Residential roofing systems.
It is the responsibility of the erector to ensure the safe installation of this product system.