Step 3 step 4, Post frame panel installation – Metal Sales Pro-Panel II Installation User Manual
Page 30
© Metal Sales Manufacturing Corporation / Subject to change without notice / Effective 5/09.
29
POST FRAME
& RESIDENTIAL
POST FRAME PANEL INSTALLATION
FIRST PANEL INSTALLED
1. Apply a row of Tape Sealant across and over the ribs of the eave panel about 3" from panel end.
2. Install the ridge panel over the eave panel and Tape Sealant with a 6" Endlap. Fasten through both
panels and Tape Sealant into support with appropriate amount of fasteners to meet local building
code. (See fastening patterns on pages 13 and 14). Fasteners must penetrate sealant.
3. After securing panel, repeat the fastening pattern at all panel support locations.
INSTALLING SIDELAP PANEL
1. Place the lapping seam of the second panel on top of previously installed panel so that panel ends
are flush at eave (See below).
2. Fasten through panel, closure, and Tape Sealant into support with appropriate amount of
fasteners to meet local building code. (See fastening patterns on pages 13 and 14). Fasteners must
penetrate closure and sealant.
3. After securing panel, repeat the fastening pattern at all panel support locations.
STEP
3
STEP
4
INSTALLING ENDLAP PANEL
STITCH SCREW
RIDGE PANEL
EAVE PANEL
TAPE SEALANT
FASTENER
INSIDE CLOSURE
FASTENER
SYPHON
GROOVE*
6"
LAP
*PANELS WITHOUT A SYPHON
GROOVE REQUIRE TAPE
SEALANT IN THE SIDELAP
(IF REQUIRED)