Connection plan, Electrical installation – Lenze E84AZESR Mains filter-RFI filter 42-96A User Manual
Page 49

Electrical installation
Connection plan
l
49
EDK84AZESxx DE/EN/FR/ES/IT 4.0
6.2
Connection plan
L1
L1' (BK)
L2' (BK)
L3' (BK)
PE (GN/YE)
L1
L2
L2
L3
L3
PE
PE
L3
N
PE
L1
L2
F1...F3
X100
E84AZESxxxxxxx
E84AVxxxxxx
K1
8400GG033
Mains terminal
Description
L1
L2
L3
Connection of the mains phases.
+
Connection of the PE conductor on the supply side.
E84AZESx005
L1, L2, L3
PE/
+
[mm
2
]
[AWG]
[Nm]
[lb−in]
[mm]
[mm
2
]
[AWG]
[Nm]
[lb−in]
[mm]
E84AZESM1834LD
2.5 ... 35
12 ... 2
2.5 ... 5.0
22.1 ... 34.3
20
2.5 ... 25
12 ... 2
4.0
35
10
E84AZESM2234LD
E84AZESM2234LDN001
E84AZESM3034LD
16 ... 50
2 ... 4/0
3 ... 6.0
26.6 ... 53.1
27
2.5 ... 25
12 ... 2
4.0
35
10
E84AZESM3734LD
E84AZESM4534LD
E84AZESM4534LDN001
Connecting cable to the
controller
Description
L1’
L2’
L3’
Filter output conductor (lead with wire end ferrules, colour
BK).
E84AZESx006