Finishing conditioner reel installation (option) – Landoll 2410 Weatherproofer I User Manual
Page 55
ASSEMBLY INSTRUCTIONS
3-37
Finishing Conditioner Reel
Installation (Option)
NOTES
Refer to Figure 3-26 for hydraulic diagram for the
2410-6-24 model.
Refer to Figure 3-27 for hydraulic diagram for the
2410-7-24 model.
Refer to Figure 3-28 for hydraulic diagram for the
2410-9-24 model.
See Figure 2-7 for finishing conditioner reel placement
dimensions.
1.
Attach reel arm assemblies to rear frame in second
hole from top using 1-8 x 7-1/2 hex head cap screw,
5” pivot bushing, and hex lock nut (See Figure 3-30.)
2.
Attach reel arms w/ extension assemblies to rear
frame using 1-8 x 7-1/2 hex head cap screws and
hex lock nuts.
3.
Attach 17” spring assembly and 2-1/2 hydraulic
cylinder to lower hole on rear frame using cylinder
trunnion, cylinder trunnion stop, 1/2-13 x 2-1/4 hex
head cap screw, and split lock washer.
4.
Install the manifold to the manifold bracket on the
frame using 1/2-13 x 3-1/2 hex head cap screws and
hex lock nuts.
5.
Install fittings into manifold according to Figures 3-26
thru 3-28.
6.
Install hoses per Figures 3-26 thru 3-28.
7.
Install steel plugs in any remaining open manifold or
valve ports.
8.
Attach conditioner reel/gang bar assembly to reel
arm assemblies using gang bar mount plates, 3/4-10
x 6 hex head cap screws, and double hex lock nuts.