beautypg.com

Landoll SCP-2 Subsoil Chisel Plow User Manual

Page 9

background image

1298rev401

6K007

Page 7

MAINTENANCE

After the first 5 or 6 hours of operation, go over the machine and tighten all nuts with lockwashers
which might be loose.

Check shank bolts daily. -Refer to set up instructions for correct tightness.

Normal periodic checks should be made thereafter.

SUPPORT STANDS

Assemble the support stands through the vertical tubes on the ends of the frame. Insert the 1/4 x 2 1/4" long
cotter pins in the top holes of the support stands to prevent them from falling out when the machine is
raised. When the machine is idle and not mounted to the tractor, the 1/2 x 3" long clevis pins, inserted
in the middle holes, will prevent the unit from tipping. Then when you raise the machine for working or
for transport, remove the clevis pins, raise the support stands all the way up and insert pins in the
lowest hole. This will keep the support stand up and out of the way while the machine is in use.

This manual is related to the following products: