beautypg.com

Warning – Hydrolevel 3100 User Manual

Page 3

background image

WARNING

Electrical shock hazard. To prevent electrical shock, death or equipment damage, disconnect power supply before
installing or servicing this control.

WIRING

SCHEMATIC/LADDER DIAGRAM

3

STEP

1

Connect 120 VAC Hot

to terminal L1. Connect 120 VAC

Neutral to terminal L2. Disconnect

means and overload protection as

required (provided by others).

STEP

2

Connect the circulator to

C1 and C2 (C2 is neutral).

STEP

3

Connect wire from 24

VAC Burner Circuit to B1(quick con-

nect). Connect wire from 24 VAC

Burner Circuit common to B2 (fork).

STEP

4

Connect wires from Low

Voltage Thermostat to T and TV.

STEP

5

If the boiler is equipped

with a plug-in style vent damper,

unplug the factory installed jumper

from the receptacle on the circuit board

and replace it with the vent damper

plug. NOTE: Once a vent damper plug

is connected to the HydroStat, the con-

trol is permanently altered and will no

longer function when the vent damper

plug is disconnected.

ZONE VALVE WIRING

IMPORTANT: Use a separate transformer to

power zone valves. Connecting zone valves to

Z-TV may overload the HydroStat and cause a

lock-out condition (see

Troubleshooting

on page 6

for more information). The total load, including the

burner circuit, vent damper, and Z-TV connections

must not exceed 1.2 amps (30 VA). Connect zone

valve end-switch to T-TV as shown below.