Sample HAST Profile for LPB Chambers

Name

SAMPLE JEDEC PROGRAM

Date

Step

No.

Set Point

Events

Duration

Comments

CH-1

E

C or

E

F

S1

CH-2

% or

E

S2

1 = ON

E1

4321

0 = OFF

E2

4321

HR

MN

SC

1

20

70

0000

0001

00

00

05

Turn on “STANDBY” OR “AUTOFILL.”

2

W3(0001)

--

--

--

--

--

Checking for proper water level & holds until satisfied.

3

115

58

--

0010

--

40

00

May be modified for special applications (ie 85/85).

4

--

--

--

--

--

--

01

Not used—reserved for special applications (ie 85/85).

5

120

58

--

0010

--

--

05

EV22 turns on fans and heaters.

6

W4(99.5)

--

--

--

--

--

Wait for near boiling condition.

7

120

58

--

--

--

10

--

Purge air by boiling for 10 minutes.

8

120

59

--

0110

00

00

01

EV23 closes the vent solenoid.

9

JS10

JC01

Jump to step 10 or other for different setpoint process.

10

120

85

--

--

00

31

00

Change to 85% RH condition.

11

--

W2(84)

--

--

--

--

--

Waits for RH% to reach near setpoint.

12

--

--

0000

--

00

30

--

Hold for 30 minutes.

13

--

--

0011

--

00

30

00

Hold for 30 min w/Devices powered and cool fans.

14

JS12

JC01

Repeat Device power off/on cycle to step #12 once.

15

JS47

JC01

JS to 47 for ramp down w/o rapid decompression.

16

--

--

Blank step.

17
18
19
20

130

--

--

--

--

10

--

Ramp C1 to 130

E

C @ 1

E

C/min first, not RH%.

21

--

85

--

--

--

--

05

Ram RH% after temperature has been reached.

22

--

W2(84)

--

--

--

--

--

Wait for near set conditions.

23

--

--

0000

--

00

30

--

Hold for 30 min w/Devices not powered (EV1.1).

24

--

--

0011

--

00

30

--

Hold for 30 min w/Devices powered and cool fans.

25

JS23

JC01

Repeat Devices powered on/off cycle to step #23.

26

JS47

JC01

Jump to 47 for shutdown w/o rapid depressurization.

27

Blank step.

28
29
30

140

--

--

--

--

20

--

Ramp temperature first to 140

E

C @ 1

E

C/min.

31

--

85

--

--

--

--

05

Begin RH% ramp after temperature is reached.

32

--

W2(84)

--

--

--

--

--

Wait for near setpoints RH% condition.

33

--

--

0000

--

00

30

--

Hold for 30 min w/Devices not powered (EV1.1).

34

--

--

0011

--

00

30

--

Hold for 30 min w/Devices powered and cool fans.

35

JS33

JC01

Repeat Devices powered on/off cycle to step #33.

36

JS47

JC01

Jump to 47 for shutdown w/o rapid depressurization.

37

Blank step.

38
39
40
41
42
43
44
45
46
47

00

60

0010

--

--

--

05

Cool EV12 on. Ramp down but maintain 60% RH.

48

W4(102)

--

--

--

--

--

Wait for liquid temperature of 102

E

C.

49

00

00

0010

1000

--

--

--

Open the drain and vent to purge old water.

50

W1(40)

--

--

--

--

--

Waits for typical safe unloading temperature.

51

00

00

0000

0000

00

00

05

Test complete light on (all EV's off).