Sample hast profile for lpb chambers – Despatch 1500 Controller User Manual
Page 30
Page 24
Despatch/Watlow 1500 Control Instruction Manual
Sample HAST Profile for LPB Chambers
Name
SAMPLE JEDEC PROGRAM
Date
Step
No.
Set Point
Events
Duration
Comments
CH-1
E
C or
E
F
S1
CH-2
% or
E
S2
1 = ON
E1
4321
0 = OFF
E2
4321
HR
MN
SC
1
20
70
0000
0001
00
00
05
Turn on “STANDBY” OR “AUTOFILL.”
2
W3(0001)
--
--
--
--
--
Checking for proper water level & holds until satisfied.
3
115
58
--
0010
--
40
00
May be modified for special applications (ie 85/85).
4
--
--
--
--
--
--
01
Not used—reserved for special applications (ie 85/85).
5
120
58
--
0010
--
--
05
EV22 turns on fans and heaters.
6
W4(99.5)
--
--
--
--
--
Wait for near boiling condition.
7
120
58
--
--
--
10
--
Purge air by boiling for 10 minutes.
8
120
59
--
0110
00
00
01
EV23 closes the vent solenoid.
9
JS10
JC01
Jump to step 10 or other for different setpoint process.
10
120
85
--
--
00
31
00
Change to 85% RH condition.
11
--
W2(84)
--
--
--
--
--
Waits for RH% to reach near setpoint.
12
--
--
0000
--
00
30
--
Hold for 30 minutes.
13
--
--
0011
--
00
30
00
Hold for 30 min w/Devices powered and cool fans.
14
JS12
JC01
Repeat Device power off/on cycle to step #12 once.
15
JS47
JC01
JS to 47 for ramp down w/o rapid decompression.
16
--
--
Blank step.
17
18
19
20
130
--
--
--
--
10
--
Ramp C1 to 130
E
C @ 1
E
C/min first, not RH%.
21
--
85
--
--
--
--
05
Ram RH% after temperature has been reached.
22
--
W2(84)
--
--
--
--
--
Wait for near set conditions.
23
--
--
0000
--
00
30
--
Hold for 30 min w/Devices not powered (EV1.1).
24
--
--
0011
--
00
30
--
Hold for 30 min w/Devices powered and cool fans.
25
JS23
JC01
Repeat Devices powered on/off cycle to step #23.
26
JS47
JC01
Jump to 47 for shutdown w/o rapid depressurization.
27
Blank step.
28
29
30
140
--
--
--
--
20
--
Ramp temperature first to 140
E
C @ 1
E
C/min.
31
--
85
--
--
--
--
05
Begin RH% ramp after temperature is reached.
32
--
W2(84)
--
--
--
--
--
Wait for near setpoints RH% condition.
33
--
--
0000
--
00
30
--
Hold for 30 min w/Devices not powered (EV1.1).
34
--
--
0011
--
00
30
--
Hold for 30 min w/Devices powered and cool fans.
35
JS33
JC01
Repeat Devices powered on/off cycle to step #33.
36
JS47
JC01
Jump to 47 for shutdown w/o rapid depressurization.
37
Blank step.
38
39
40
41
42
43
44
45
46
47
00
60
0010
--
--
--
05
Cool EV12 on. Ramp down but maintain 60% RH.
48
W4(102)
--
--
--
--
--
Wait for liquid temperature of 102
E
C.
49
00
00
0010
1000
--
--
--
Open the drain and vent to purge old water.
50
W1(40)
--
--
--
--
--
Waits for typical safe unloading temperature.
51
00
00
0000
0000
00
00
05
Test complete light on (all EV's off).
Note: --'s in above sample indicate parameter is left blank. Blank is not the same as zero.