50’ NAVI-TRAC COMPLETE

WITH (2) 10’ MID BAYS

18

1.

ALL ENGINEERING ON THE 50’ NAVI-TRAC WAS DONE WITH THE WALLS IN PLACE. (FULLY

ENCLOSED). SEE NEXT PAGE FOR SIDEWALL INSTALLATION.

2.

INSTALL, STAKE, AND TENSION ALL GUY WEBS, AS SHOWN IN THIS MANUAL. TENSION FABRIC SO THAT ALL
CATENARY ARCHES ARE EQUIDISTANT BELOW THE EAVE BARS.

3.

REVIEW PAGE 12 FOR GUYING AND TENSIONING INSTRUCTIONS.

X-CABLED BAYS

STAKE PLATES AT PROPER SPACING BEFORE
INSTALLING THE X-CABLES. THEN, ADJUST
TURNBUCKLES UNTIL CABLE IS SNUG

REMOVE NUTS FROM THE BOLTS THAT PIN THE
BASEPLATE TO THE UPRIGHT. TURN BOLTS SO THE
THREADS ARE TO THE INSIDE (TOWARD CENTER OF
BAY). THREAD CABLE EYE NUTS ONTO BOLTS TO
SECURE THE CABLE.

NAVI-TRAC UNITS 100 FT. OR MORE IN LENGTH MUST HAVE AN X-CABLED BAY
NEAR THE MIDDLE OF THE UNIT (AND/OR EQUALLY SPACED) FOR EVERY 100 FT.
UNIT OF LENGTH.

SUBSTITUTE BOLTS FOR PINS AT
THE TOP OF BOTH UPRIGHTS AND
BOTTOM AND TOP OF BOTH RAF-
TERS. THREADS SHOULD POINT
INWARD TOWARD CENTER OF
BAY. THREAD CABLE EYE NUTS
ONTO EACH BOLT TO SECURE THE
CABLES AS SHOWN.

FOR CABLE CONNECTIONS AT MID
PORTION OF RAFTERS, INSERT
THE BOLTS IN THE HOLES OF THE
RAFTER THAT ARE JUST ABOVE
AND JUST BELOW THE PURLIN
CONNECTION. THREADS SHOULD
POINT INWARD TOWARD CENTER
OF BAY. THREAD CABLE EYE NUTS
ONTO EACH BOLT TO SECURE THE
CABLES AS SHOWN.

PURLIN

X-CABLING IS IDENTICAL
ON BOTH SIDES OF THE
STRUCTURE.

UPRIGHT X-CABLES
ARE COLOR-CODED
GREEN AND LA-
BELED 10, 15, OR 20
ACCORDING TO BAY
SIZE.

LOWER-RAFTER X-
CABLES ARE COLOR-
CODED RED AND
LABELED 10, 15, OR
20 ACCORDING TO
BAY SIZE.

UPPER-RAFTER X-CABLES ARE
COLOR-CODED BLUE AND LABELED
10, 15, OR 20 ACCORDING TO BAY
SIZE.