12 foot switch adjustment, 13 boom synchronizing procedure (a models only), Foot switch adjustment -29 – JLG 660SJ ANSI Service Manual User Manual
Page 165: Boom synchronizing procedure (a models only) -29, Flow control card settings -29, Flow control card ramp time -29
![background image](/manuals/552205/165/background.png)
SECTION 4 - BOOM & PLATFORM
3120718
– JLG Lift –
4-29
4.12 FOOT SWITCH ADJUSTMENT
Adjust so that functions will operate when pedal is at cen-
ter of travel. If switch operates within last 1/4 in. (6.35 mm)
of travel, top or bottom, it should be adjusted.
4.13 BOOM SYNCHRONIZING PROCEDURE (A
MODELS ONLY)
NOTE: If the Lower Boom assembly does not fully lower:
1.
Remove all personnel from the platform.
2.
Pull the red knob located under the manual descent
control valve.
3.
From Ground Control, activate the lift control switch,
raise Lower Boom 6 feet (1.83m).
4.
After raising Lower Boom, release the red knob.
5.
Activate Lower Boom Down, fully lower boom.
6.
Repeat step 1 thru 5 if necessary.
Table 4-2. Flow Control Card Settings
S Models
Function
Minimum Current
Maximum Current
Lift Up
450 to 55o mA
1400 to 1500 mA
Lift Down
450 to 550 mA
1400 to 1500 mA
Swing Right
450 to 550 mA
1400 to 1500 mA
Swing Left
450 to 550 mA
1400 to 1500 mA
Flow Control
750 to 850 mA
1400 to 1500 mA
Drive Forward
40 to 60 mA
150 to 200 mA
Drive Reverse
40 to 60 mA
150 to 200 mA
A Models
Lift Up
450 to 550 mA
900 to 1000 mA
Lift Down
450 to 550 mA
1400 to 1500 mA
Swing Right
450 to 550 mA
1400 to 1500 mA
Swing Left
450 to 550 mA
1400 to 1500 mA
Flow Control
750 to 850 mA
1400 to 1500 mA
Drive Forward
50 to 60 mA
150 to 200 mA
Drive Reverse
50 to 60 mA
150 to 200 mA
Table 4-3. Flow Control Card Ramp Time
Function
Ramp Time
Lift Up
Ramp Up Time = 4:00 sec.
Ramp Down Time = 3:00 sec.
Lift Down
Ramp Up Time = 4:00 sec.
Ramp Down Time = 3:00 sec.
Swing Right
Ramp Up Time = 4:00 sec.
Ramp Down Time = 3:00 sec.
Swing Left
Ramp Up Time = 4:00 sec.
Ramp Down Time = 3:00 sec.
Drive Forward
Ramp Up Time = 4:30 sec.
Ramp Down Time = 2:30 sec.
Drive Reverse
Ramp Up Time = 4:30 sec.
Ramp Down Time = 2:30 sec.
Flow Control
Ramp Up Time = 3:00 sec.
Ramp Down Time = 0:00 sec.