beautypg.com

11 replacing the main control board – Eppendorf 3100 Digital Water Bath Shake User Manual

Page 37

background image

31

Innova 3100

M1231-0050

Operating manual

5.11

Replacing the Main Control Board

1. Switch the shaker OFF and disconnect the power cord.
2. Remove the five screws that hold the front panel (two screws on the sides and

three on the bottom), and allow the front panel to lie on its face.

3. Remove the temperature control board:

a. Disconnect the harness wiring from connectors J101, J102, J103 and J104 (see

Figure 13 below).

b. Remove the three 1/4” screws, the two nylon flat washers and the temperature

sensor ground lug.

c. Disconnect the temperature control board from the main control board, being

careful not to damage the board-to-board connectors. Apply force
perpendicular to the plane of the board. Do not lift from one end.