beautypg.com

Emergency operation, Emergency operation procedures 9-1, Operation from platform control box 9-1 – Snorkel MHP34J(Bi-Energy Option) User Manual

Page 51: Emergency operation, 9-1, Operation from platform control box, 9-1, Procedures, 9-1, Emergency operation procedures -1, Operation from platform control box -1

background image

9. Emergency Operation

Emergency Operation Procedures

The following procedures are emergency proce-
dures only. DO NOT use them for normal operation.
Their purpose is to get the platform and operator
safely to ground when the MHP12/34J will not start
or some other problem keeps the platform from low-
ering in the normal way.

Operation From Platform Control Box

Switch settings listed in the three steps below must
exist at the ground before emergency operation
procedures will work at the platform control box:

Figure 9.1

1. The Master Key Switch



must be ON (see

Figure 9.1).

2. The Emergency Stop switch

€

must be

(ON) (see Figure 9.1).

3. The Platform/Ground Selector switch



(see Figure 9.1) must be set to PLATFORM.

Figure 9.2

4. Set the Emergency Stop switch

‚

to ON

(see Figure 9.2).

5. Set the Anti-Restart switch

ƒ

(see Figure

9.2) to ON.

Figure 9.3

6. Step on the platform foot switch

„

(see

Figure 9.3).

Figure 9.4

7. Hold the Emergency Lower switch

…

(see

Figure 9.4) down and the platform will begin
lowering.

NOTE

To slew when using emergency lowering operate
the slew switch

†

in the direction required (see

Figure 9.4).