beautypg.com

Voltage confirmation – American Power Conversion Smart-UPS User Manual

Page 34

background image

Restart – Parts Replacement

28

Smart-UPS® VT ISX 20-30 kVA, 200 V Operation

990-2818A

Voltage confirmation

At the restart, the display will prompt you through the following screens:

• When the Confirm Voltage prompt appears on the screen, select desired voltage and press ENTER.

• When the prompt Apply load appears, select YES if you want the UPS to provide a load output now.

(If you do not want a UPS load output at this point, select NO).

LOAD ON LED is now lit, and the display will show the Confirm Menu Screen.

• Reinstall cable landing cover plates.

• For any optional equipment, refer to product-specific manuals.

See display introduction under The Display.

Note

The UPS is now ready to support the load.

Note

Auto-detection on frequency – if problem occurs call APC Customer Support.

Confirm Voltage
Use 200V
Yes, use 200V
No, select another

Apply load?
Yes
No

Chrg xxx% ||||||||||
Load xxx% ||||||||||
xxx Vin xxxVout xxHz
Runtime: xxhr xxmin

Status screen