Voltage confirmation – American Power Conversion Smart-UPS User Manual
Page 34
Restart – Parts Replacement
28
Smart-UPS® VT ISX 20-30 kVA, 200 V Operation
990-2818A
Voltage confirmation
At the restart, the display will prompt you through the following screens:
• When the Confirm Voltage prompt appears on the screen, select desired voltage and press ENTER.
• When the prompt Apply load appears, select YES if you want the UPS to provide a load output now.
(If you do not want a UPS load output at this point, select NO).
LOAD ON LED is now lit, and the display will show the Confirm Menu Screen.
• Reinstall cable landing cover plates.
• For any optional equipment, refer to product-specific manuals.
See display introduction under The Display.
Note
The UPS is now ready to support the load.
Note
Auto-detection on frequency – if problem occurs call APC Customer Support.
Confirm Voltage
Use 200V
Yes, use 200V
No, select another
Apply load?
Yes
No
Chrg xxx% ||||||||||
Load xxx% ||||||||||
xxx Vin xxxVout xxHz
Runtime: xxhr xxmin
Status screen