beautypg.com

How to install battery modules – American Power Conversion Smart-UPS User Manual

Page 28

background image

Configuration – Parts Replacement

22

Smart-UPS® VT ISX 20-30 kVA, 200 V Operation

990-2818A

How to install Battery Modules

If additional batteries are needed for extra run-time, or if you install battery replacement modules, follow
the below procedure:

Install batteries in the lowest available bay.

Position the battery to slide in between the grooves and push completely into the UPS to ensure
connection.

Caution

Wait until the system is ready to be powered up before installing Battery Modules in the UPS.
Failure to do so can result in a deep discharge of the batteries and cause permanent damage
(the time from the battery installation time till the UPS is powered up should not exceed 72
hours, or 3 days).

If a problem is reported, ensure that the modules in question are correctly installed. If the
problem persists, refer to the Troubleshooting section.

Note

Allow for a 24-hour recharging period of the batteries after system start-up / battery
replacement for battery monitoring data to become fully reliable.

su

o0

31

1a