3 . Verify that the nitrogen cylinder pressure using the center
gauge of the nitrogen regulator assembly . The system WIll
nOT operate efficiently if the pressure falls below 500 psi .
If below 500 psi, replace the nitrogen cylinder .

4 . Turn the left regulator stem clockwise to the proper

pressure setting of the “a” tank (120–160psi – Do not go
over 225psi) (see section 12) .

If a hissing sound occurs, further tighten the yellow/red-

coded nitrogen line connection to the nitrogen regulator
assembly and/or the nitrogen intake valve connection on the
“a” tank using an adjustable wrench . If the left gauge fails
to indicate a pressure setting, contact your Dow Sales
Representative .

5 . Turn the right regulator stem clockwise to the proper

pressure setting of the “B” tank (120-160psi – Do not

go over 225psi) (see section 12) .

If a hissing sound occurs, further tighten the yellow/blue-

coded nitrogen line connection to the nitrogen regulator

assembly and/or the nitrogen intake valve connection on the

“B” tank using an adjustable wrench . If the right gauge fails

to indicate a pressure setting, contact your Dow Sales

Representative .

6 . Slowly open the nitrogen intake valve of each tank . The valve

handles should be parallel with the nitrogen lines .

7 . Slowly turn on the chemical valve of each tank . The valve

handles should be parallel to the chemical lines . Verify that

the filter connection of each tank is tight and that no chemical

leaks are present .

8 . Slowly turn on the on-off valves . The handles should be

parallel to the chemical lines . Verify that the connections of

each valve are tight and that no chemical leaks are present .

9 . Slowly turn on the in-line on-off valves . The handles should

be parallel to the chemical lines . Verify that the connections of

each valve are tight and that no chemical leaks are present .

10 . Remove the used nozzle by pushing down the nozzle ejector .

8 .2 System Purging and Testing

1 .

dO nOT breathe vapor or spray . Proper PPE and ventilation

are required . See product SDS and Section 2 of this manual

for further information . Follow all precautions for product .

2 . Dispense chemicals in an appropriate container .

This is to verify proper chemical flow .

3 . Clean any chemical from the InSTa-FlO™ Gun face

using a rag or paper towel .

4 . Insert an unused nozzle with the key slot down . Push

in firmly until the nozzle ejector is seated over the

back rim of the nozzle .

5 . Dispense foam to verify proper chemical mixing .

If improper mixing or poor foam quality, refer to the

Troubleshooting section, Section 10 of this manual .

Section 9

Tank Change-over

1 .

dO nOT breathe vapor or spray . Proper PPE and ventilation

are required . See product SDS and Section 2 of this manual

for further information . Follow all precautions for product .

2 . Putting on a fresh set of tanks is essentially the same process

as the initial start-up . One big difference is that the lines have

chemicals in them . If exposed to the atmosphere for more

than a few minutes, the a Side line will become plugged . So

keep the lines hooked up to the empty tanks until you are

ready to put on the fresh set .

3 . Double check that the nitrogen tank is above 500 PSI .

4 . Prep the new tanks as outlined above right to the point of

hooking up lines .

16