Installing azek rail stairs with glass infill – AZEK Rail User Manual
Page 37
Page 37
Installing AZEK Rail Stairs with Glass Infill
INSTALL TOP GASKET AND TOP GLASS CHANNEL
8
Top Glass Channel:
Pre-drilled holes are
on side
• Place Rubber Gasket on top of glass panel.
• Fit Top Glass Channel onto glass panel assembly.
INSTALL TOP SUPPORT RAIL
• Mark Ends of Top
Support Rail.
• Rotate Rail assembly
out of way to fasten
Support Block
• Secure
Mounting
Brackets to
Posts.
9
Pre-drill
7/64”
#8 x 3”
Green
Coated
Screws
Pre-drill
7/64”
#8 x 3”
Green
Coated
Screws