beautypg.com

Installing azek rail with glass infill – AZEK Rail User Manual

Page 33

background image

Page 33

INSTALL TOP RAIL AND POST CAPS

10

• Attach Post Caps using exterior grade caulk applied to the underside of the Cap.

#8 x 2 1/4”

Coated Screws

3/16” Pre-drill

through existing

holes in Top Glass

Channel and

through the Top

Support Rail.

Caution:

Screws must

be 2 1/4” to attach the
Top Rail on the Straight
Rail sections.

Installing AZEK Rail with Glass Infill