Pulsafeeder Chem-Tech Series XP TIMER EN User Manual
Page 15

REV. A PN J63143
- 15 -
Figure 9c: Finishing the New Tube Installation
6) Using the mode selector switch, run the pump for several revolutions and then
fully tighten the thumb screws hand tight.
7) Return the pump to service by following the procedures in the installation
section.
6.3. Pools and Spas
Pumps carrying the “ETL Sanitation” (tested to NSF Standard-50) marks are
listed for swimming pools, spas and hot tubs, and when proper materials are
selected, are capable of handling but not limited to the following chemical
solutions:
12.0% ALUMINUM SULPHATE, 5.0% SODIUM CARBONATE,
2.0% CALCIUM HYPOCHLORITE, 10.0% SODIUM HYDROXIDE,
12.5% SODIUM HYPOCHLORITE, 10.0% HYDROCHLORIC ACID.
To meet the requirements of the “ETL Sanitation Mark” qualification, 1) Replace
the peristaltic tubing (as described above), 2) Grease the rotor bearing and 3) Oil
the three rotor rollers at intervals of 500-hours operation time (actual running
time).